//www.googletagmanager.com/ns.html?id=GTM-KZGK
University Facilities

Guidelines for Commission Architects and Engineers (Green Book)

The following set of instructions and standards are intended for use by consulting engineers, architects, and other campus entities involved in new construction and renovation projects for Clemson University. These standards are intended to provide a level of consistency for future maintenance and repairs as well as a standard of quality for the various facilities and systems at Clemson University. Deviations from these standards by the A/E or other entity responsible for design MUST be brought to the attention of the Project Manager in writing at the beginning of the construction document design review process to afford the University the opportunity to reject or accept the deviation. The guidelines do not relieve the designer of any professional responsibility as their design relates to the applicable building codes and requirements. These documents are not intended to serve as technical specifications for any product or division.

Download a printable copy of the Guidelines for Commission Architects and Engineers

These instructions are categorized in accordance with current Construction Specification Institute (CSI) formatting.

Utility Links

Search

Text Only Options

Top of page


Text Only Options

Open the original version of this page.

Usablenet Assistive is a UsableNet product. Usablenet Assistive Main Page.