Hunter Hall Rebuild AHU's 1,2 and 3

Project  #CUP-4001327

Rebuild AHU 1,2 and 3 in Hunter Hall, including the demolition and disposal of existing assemblies, and the installation of new filter assemblies, chilled water coils, drain pans, condensate drains, supply fans, and stainless steel flooring.  Owner will supply fans, drives, motors, coils, and moisture eliminator for contractor installation.

Please note:  If you have trouble viewing the forms below, try saving them directly to your PC by right-clicking on a document's link and selecting "Save As" or "Save Target As" from the menu that appears.

Relevant Documents

Specifications
September 25, 2012

Drawings
September 25, 2012

Addendum No. 1
October 17, 2012

Addendum No. 2
October 19, 2012

Notice of Intent to Award
October 26, 2012 