Mansfield University of Pennsylvania

Page Content   Local Links   Main Links   Utility Links   Footer

Mansfield University Home Page > Finance & Administration Home Page > Physical Plant

Mansfield University's Physical Plant is organized into departments of Maintenance, Utilities, Motor Pool, and Grounds/Custodial. The main office of the Physical Plant is located in Brooks Maintenance on Sherwood Street which is across Rt. 6 from the main campus.

Lighting Retrofit Installation Schedule - This schedule is for all buildings which will be receiving new lighting in all rooms & hallways, motion detectors in classrooms and restrooms, and weatherization projects throughout the campus to ensure energy savings at Mansfield for the future. This is a project which has been in the planning stages for the past two years. The schedule may change from time to time, but our goal is to stay within the proposed schedule as closely as possible.

In the near future we will also be installing a centralized air conditioning system in Decker Gymnasium & Elliott Hall. In addition the Air Handlers in Steadman Theatre will be changed. As of this point, we do not have a definite schedule for these projects, but will forward that information as soon as it becomes available.

Director, Physical Plant:

Benjamin W. Jones
107 Brooks Maintenance
570-662-4913

Building Maintenance & Construction Manager:

Gregory K. Black
Brooks Maintenance
570-662-4960

Utility Plant Manager:

Richard Nelson
102 Brooks Maintenance
570-662-4905

Custodial/Grounds Manager:

Secretaries:

Donna Emmick
109 Brooks Maintenance
570-662-4907

Joyce Stragapede
109 Brooks Maintenance
570-662-4383

Main Links

Utility Links

Text Only Options

Top of page


Text Only Options

Open the original version of this page.

Usablenet Assistive is a UsableNet product. Usablenet Assistive Main Page.