Facilities

Existing Terrace Drive entrance to Van Deusen Hall and proposed Terrace Drive entrance to the Visual Arts Center
Existing Terrace Drive entrance to Van Deusen Hall and proposed Terrace Drive entrance to the Visual Arts Center
Demolition begins on the Art Annex; the stack and former heating plant equipment are removed. The proposed Ceramics program kiln yard and sculpture program studios.
Demolition begins on the Art Annex; the stack and former heating plant equipment are removed. The proposed Ceramics program kiln yard and sculpture program studios.
The old stack comes down, November 2013.
The old stack comes down, November 2013.
View of Van Deusen Hall, now Printmaking and Jewelry/Metals studios. Proposed view of new Drawing, Painting, and Foundations studios, keeping the signature louvered roof.
View of Van Deusen Hall, now Printmaking and Jewelry/Metals studios. Proposed view of new Drawing, Painting, and Foundations studios, keeping the signature louvered roof.
The new Center for the Visual Arts

Construction began this summer on the newly envisioned Center for the Visual Arts. The plan includes complete renovation of both Van Deusen Hall and the Art Annex/heating plant with an integrating walkway and classrooms connecting the two former buildings. This multi-year project will result in the collection of all School of Art programs having a home in one building. For further information please contact the Director of the School of Art, Christine Havice.

Payto Architects renderings

Director, School of Art
chavice@kent.edu
Phone: 330-672-2192

Local Links

Utility Links

Text Only Options

Top of page


Text Only Options

Open the original version of this page.

Usablenet Assistive is a UsableNet product. Usablenet Assistive Main Page.