Skip Navigation
Phone directory
*To search for student contact information, login to FlashLine and choose the "Directory" icon in the FlashLine masthead (blue bar).

Power Plant

Kent State University's Power Plant supplies steam, electricity, and air conditioning to the Kent campus. Since the University's early years, centralized steam production has been used to provide heat and cooling to the campus community.

Kent State University successfully completed its two-stage, combined heat and power project. Two generators were installed that together produce 13 megawatts of electricity and over 60,000 pounds of steam per hour which is distributed to the University. What makes combined heat and power efficient for Kent State is not only their need for power but, the fact that Kent State has a year round need for steam.

For additional information:

The Power Plant is located at 1501 Ted Boyd Drive at the corner of Summit Street and Ted Boyd Drive.  Please contact the Power Plant at 330-672-4301 or e-mail energy@kent.edu for additional information regarding Power Plant operations.

Directions

Text Only Options

Top of page


Text Only Options

Open the original version of this page.

Usablenet Assistive is a UsableNet product. Usablenet Assistive Main Page.